STEEL BUILDING INSTALLATIONS
Pre-Engineered Building Installation Services (Erection and Sheeting )We Are One of the leading well reputed structural steel building Erection Service Providers in India Offering World Class Structural Steel Building To Meet certified quality standards and complete client requirements Our company also has a complete set of erection tools and Tackles Our company also has well experienced erection teams and site engineers . in Order to ensure clients satisfaction in terms of quality and price. We are the certified PEB Installation Vendors for the below companies
- TATA Bluescope Steel Ltd.
- Pennar Engineered Building Systems Ltd.
- Kirby Building Systems India Ltd.
- Contour Steel Engineering India Ltd.
- Multi Colour Steel Projects India Ltd.
- Interacrh Building Products Pvt. Ltd.
Water Test and Handing Over
Water test for testing the roof is made in the presence of client/consultant representative. The arrangement for the same is also done in accordance with the client representative. Leakages, if any are immediately sealed and re water test is conducted.Statutory Obligations:We comply with all statutory, labour, laws, and minimum wages and maintain the necessary records at site.We submit the proof of payment made to ESI & PF.We submit the workmen compensation policy/ ESI details to clients within one week from receipt of Work Order, With work schedule.
Safety Equipments
First aid kit at site.All workers and personnel strictly wears PPE.Firm Ladders have to be provided for the access of workers to reach the roof level. Purling Challisand man basket Must be provided at site for Safe erection.Lifelines have to be provided for fixing the secondary members and during roof sheeting for theworkers to hook their safety belts.Electrical distribution board are used with required industrial sockets & switches for safeworking.Electrical cables tested for cuts/burns prior to the usage.Movable scaffolding for fixing of secondary members and for cladding works.Trolley for holding DA and oxygen cylinders in vertical position.Cordoning off roof openings till openings are closed.Cordoning off erection area from other agencies to enter.Crane/hydra tested for safety prior to erection.Ensuring supervisor/engineer to conduct toolbox meeting on daily basis.Safety display boards & logbook containing contact numbers maintained at site.
Painting
Colour, type, brand, no of coats, Ral Number confirmed with the client.Sufficient inventory of paint is maintained at the site.Proper touch up after erection is carried out.Painting equipments like brush/compressors are arranged adequately.Tools, Tackles, Equipment and machineryList of all erection and sheeting related tools used at site are mentioned.Manpower:Details of each and every worker including name, age, address, photo ID and skill test maintainedtill the final handover of the building to the client.Erection:Thorough checking of anchor bolts with respect to line, levels, locations and critical dimensions carried out and anchor bolt report is submitted before commencing erection.Thorough checking of material with respect to packing list, shipper list and drawing done prior tocommencing erection.
Painting of structural members as per the priority of erection.Type of lifting equipments/crane as required for erection (capacity & boom height).Scaffold as per the height of the structure.Thorough studying of drawing by the site engineer/supervisor.Erection to start with a braced bay in all types of structures.Where span (width) is less than length of structure proceed erection bay wise.Where span (width) is more than the length of structure proceed erection module wise.
Roof, Wall cladding and Finishing
Before starting any sheeting work, we check for complete alignment of the portion of structure to be sheeted and submit alignment Report to the PEB Supplier’s Engineer. Calculation of manpower and machinery required for the sheeting area. Mobile scaffold to carryout the wall cladding.Sufficient props or wooden supports to be provided from ground level for grits which are sagging before cladding. All purling to be straightened before roof sheeting. Proper scaffold or firm ladder /staircase to reach the roof top. Check the diagonals of the first layer of sheets both for roof and wall cladding Proper method of screwing of roof as well as wall sheeting. Fixing of mastic tape for roof sheeting with proper overlaps of sheets as specified.All flashings & trims are properly lapped and aligned. All closures are properly sealed and screwed such that they are firmly fixed.Gutter and downspouts are aligned properly. For tightening of screws, screwing machines with depth gauge sockets are used. Life lines fixed such that all sheeting team working at heights use it for hooking the safety harness belt.